Published Oct 3, 2022
2 mins read
425 words
This blog has been marked as read.
Double Click to read more
Economics
Others

Will Make 2560 Mw Electricity By Recycling The Water Of Brahmani River

Published Oct 3, 2022
2 mins read
425 words

If all goes well, in the next decade, the district will also be identified with pumped storage power generation. by lifting water to a height

The turbine runs non-stop for the next month for environmental clearance. Public Hearing

Electricity is made from recycling. This will be available 24 hours a day. The water consumption is also negligible in this. There are such uninterrupted power generation plants in West Bengal. In Rajasthan, the work of such a project started in Baran. Now the process of setting up the second power plant in Bhaisrodgarh area of ​​the district is underway. investment in the energy sector by the state government Energies Pvt Ltd showed interest in Pumped Storage Power Project.

 Which is the sister concern of Somila Energy Company. Suitable location was found in Sukhpura in Dhangadmau Gram Panchayat of Bhaisrodgarh area. Where Brahmani is the river and the height as a hill. A total project of 2560 MW capacity is proposed. It will have two plants. Lift the water from the Brahmani river and take it to an artificial dam at a height of 100 meters. From there electricity will be generated by dropping it on the turbine. On the proposal of the company, the Rajasthan Pollution Control Board has also fixed a public hearing for environmental clearance. Which will be held in Borao on November 4. The process is going on as per the directions of the Union Ministry of Environment, Forest and Climate Change. The work of a similar project worth Rs 9,000 crore has already started in Shahbad, Baran. The proposed project in Chittorgarh district is about 13 special things for seven days Format of the proposed power plant.

According to the engineers, it is a technology of generation of electricity in a different way like solar energy. In this, electricity is generated from the recycling of water. Water consumption is also negligible. The rain water will go from Kundal, Borao hills to Brahmani river. This water will be collected in two artificial ponds near Sukhpura and released on the turbine. Electricity will be generated in it. No brakes i.e. 24x7 hours of electricity will be available. At a time, 1.8 TMC of water will be lifted and will keep coming back to the same place. Electricity will also be available cheap. have been thousand crores. If all goes well, this project will come on the ground in four to five years. In this, the requirement of 815 hectares of land was mentioned. It will have 678 hectares of forest area and two ponds. 

India
River
riverfront
18
1
sheetal.thakur 10/4/22, 5:40 PM
Please view my blog

Candlemonk | Earn By Blogging | The Bloggers Social Network | Gamified Blogging Platform

Candlemonk is a reward-driven, gamified writing and blogging platform. Blog your ideas, thoughts, knowledge and stories. Candlemonk takes your words to a bigger audience around the globe, builds a follower base for you and aids in getting the recognition and appreciation you deserve. Monetize your words and earn from your passion to write.